Contact(s)
SCADA (Supervisory Control and Data Acquisition)
SCADA automation system is used to monitor and control processes at the Water Filtration Plant, West Orillia Well, Zone 3 Booster Station, Storage Reservoirs, Wastewater Treatment Centre, and Sewage Pumping stations. While most of the processes are run automatically by local Programmable Logic Controllers (PLC), the SCADA system continuously records operation, provides alarm notifications, and allows operators to remotely monitor and control the system process.
The following documents are the current City of Orillia SCADA Standards that must be adhered to for any projects involving SCADA integration. Any project deviations from the SCADA standards must be documented and approved by the City of Orillia, and any changes that need to be applied to the SCADA standards as the result of a project must be documented and provided to the City of Orillia.
City of Orillia SCADA Design Standards
City of Orillia PLC Programming Standard
City of Orillia SCADA HMI Programming Standard
City of Orillia FAT Plan Template
City of Orillia SAT Plan Template
We attempt to make our website documents accessible, however, some of these documents may not completely meet the AODA accessibility requirements. If you require assistance or communication support, please contact 705-326-1502.