Project Summary |
---|
Location: Tecumseth Street from Laclie Street to Centennial Drive/Canice Street (approximately 200m). |
Budget: T.B.D. |
Timeline: The Municipal Class Environmental Assessment (MCEA) design is anticipated to be complete in 2023 and construction is anticipated to begin in late 2023. |
Current Status: The project is currently in the final stages of design. |
Consultant: R.J. Burnside & Associates Ltd. |
Project Contact: Drew Davidge, 705-797-4358, drew.davidge@rjburnside.com Steven Murphy, smurphy@orillia.ca |
Project Description |
This project will include reconstruction of the roadway and sidewalk, as well as design and installation of water, sanitary and storm sewer servicing to replace aging infrastructure. Tecumseth Street from Laclie Street to Centennial Drive/Canice Street is a two-lane road with a 400mm watermain, a 250mm gravity sanitary sewer, and stormwater sewers. |