Project Summary |
Location: West Street South from James Street to Highway 12 |
Budget: $450,000 |
Timeline: The Municipal Class Environmental Assessment (MCEA) and design are anticipated to be complete in early 2023. |
Current Status: The project is currently in the final stages of design. |
Consultant: R.J. Burnside & Associates Limited |
Project Contact: Drew Davidge, 705 797 4358, drew.davidge@rjburnside.com Steven Murphy, 705-418-3550, smurphy@orillia.ca |
Project Description |
The City undertook a Municipal Class Environmental Assessment (MCEA) to consider options for the widening of West Street South to support the connection between downtown Orillia and Highway 12 and to meet the needs of anticipated population and employment growth and traffic demands, including active transportation. The preferred option selected through the MCEA process was as a three lane cross section with bicycle lanes. The detailed design is underway, anticipated to be completed in early 2022, with construction starting in the summer of 2022. |
Project Documentation |
Public Information Centre Documents |
Option 1 - Do nothing (no plan to display) Option 2 As the above drawings are large drawings, they may take a few minutes to load on your browser of mobile device. A photo gallery of the options is below as an alternative viewing option. Photo Gallery: West Street Widening Options will appear here on the public site.
|